The first step: the employee uses a forklift or a crane to put the coil into the feeder, the feeder automatically levels, feeds the material into the punch die, and presses the punch; the
second step: after the punching is completed, the 4-axis robot 1 takes out the blank And send it to the punch 2 mold.
The third step: After the punch 2 starts and the stamping is completed, the 4-axis robot 2 takes the product out and puts it on the conveyor belt.
One production process ends, and the next cycle is carried out to realize automated production.
The equipment of this line includes: 2 4-axis 15 kg robots, 1 2-in-1 automatic feeder, and 1 receiving conveyor line.